:::

Performance Indicators

Last Update: May 19, 2025
FaceBook Twitter Plurk QRCode PRINT
Performance Indicator/NPP Chinshan Kuosheng
1 2 1 2
Mitigating
Systems
The unavailability of residual heat removal (RHR) green-light green-light green-light green-light
The unavailability of emergency diesel. generator (EDG) green-light green-light green-light green-light
Safety system functional failures green-light green-light green-light green-light
Barrier
Integrity
Reactor Coolant System Specific Radioactivity green-light green-light green-light green-light
Reactor Coolant System leakage green-light green-light green-light green-light
Emergency Preparedness Drill/Exercise Performance green-light green-light
Emergency Response Organization Drill Participation green-light green-light
Alert and Notification System Reliability green-light green-light
Radiation protection Occupational Radiation Exposure Control Effectiveness green-light green-light green-light green-light
The performance of the Radiological Effluent Control Program green-light green-light green-light green-light

green-light:indicates performance within an expected performance level where the associated cornerstone objectives are met.
white-light:represents performance outside an expected range of nominal utility performance but related cornerstone objectives are still being met.
yellow-light:indicates related cornerstone objectives are being met, but with a minimal reduction in the safety margin.
red-light:signals a significant reduction in safety margin in the area measured by the performance indicator.

back