:::

The Thresholds of Performance Indicator

Last Update: Jan 11, 2024
FaceBook Twitter Plurk QRCode PRINT
Cornerstone Performance Indicator Thresholds
green-light white-light yellow-light red-light
Mitigating Systems The unavailability of safety system in the previous 12 quarters All Plants ≦2EDG ≦2.5% >2.5%  >5.0%  >10.0% 
>2EDG ≦2.5%  >2.5% >10.0% >20.0% 
BWR HPCS ≦1.5% >1.5% >4.0%  >20.0% 
RHR ≦1.5% >1.5% >5.0% >10.0%
The number of safety system functional failures in the previous 4 quarters BWR ≦6.0 >6.0 NA NA
Barrier Integrity The percentage of Reactor Coolant System specific activity to the Technical Specification limit in the previous 4 quarters ≦50.0% >50.0% >100.0%  NA
Public Radiation Safety :The percentage of Reactor Coolant System leakage rate to the Technical Specification limit in the previous 4 quarters ≦50.0% >50.0% >100.0%  NA
Emergency Preparedness Drill/Exercise Performance ≧90% ≧70% <70% NA
Emergency Response Organization Drill Participation ≧80% ≧60% <60% NA
Alert and Notification System Reliability ≧94% ≧90% <90%  NA
Occupational
Radiation Safety
Occupational Radiation Exposure Control Effectiveness in the previous 4 quarters ≦2 >2 >5 NA
Public Radiation
Safety
The performance of the Radiological Effluent Control Program in the previous 4 quarters ≦1 >1 >3 NA

green-light:indicates performance within an expected performance level where the associated cornerstone objectives are met.
white-light:represents performance outside an expected range of nominal utility performance but related cornerstone objectives are still being met.
yellow-light:indicates related cornerstone objectives are being met, but with a minimal reduction in the safety margin.
red-light:signals a significant reduction in safety margin in the area measured by the performance indicator.

back