一、抽查龍門電廠FSAR「1.D.2.2.2 Specific SBO Design Basis」最後一項:「Required plant core cooling and containment integrity during the SBO duration (10 minutes) is depend on any AC power sources.」,發現與美國ABWR DCD(Design Control Document)規範不合,亦不合理。
二、請再行檢視龍門電廠FSAR 「1D Station Blackout(SBO)」內容,並與美國ABWR DCD「1C ABWR Station Blackout Considerations」內容進行比較,如有不合理之處,請主動提出FSAR修改案。